AI for Energy and Solar Contractors

For solar and storage contractors: what AI can do across a project from utility bill to permission to operate, why old tax-credit language is the biggest near-term risk, and what the permitting evidence does and does not show.

Most of the delay in solar is not on the roof

The crew might finish a residential system in a day or two. The rest of the calendar goes to site surveys, plan sets, permit packets, utility applications, inspections and waiting. Lawrence Berkeley National Laboratory’s August 2026 data update shows why this matters to the price. Soft costs and other balance-of-system costs together make up roughly 80% of the installed price.[4] That figure includes non-module hardware such as racking as well as soft costs, so it is not “soft costs are 80%”. The soft-cost part covers items such as customer acquisition, installation labor, permitting and interconnection, financing fees, taxes and profit.[4]

The market is also moving under you. Installed residential solar was about 4,647 MW in 2025, down about 2%, according to PV Tech’s report of SEIA and Wood Mackenzie data.[5] LBNL reports battery attachment rising from 25% of residential installs in 2024 to 37% in 2025.[4] Storage adds equipment, incentive and interconnection detail to every job. Those figures predate the end of the homeowner tax credit, so the sales conversation has changed as well.

So the useful question for an owner is narrow: which steps between lead and permission to operate (PTO, the utility’s approval to switch on) are repetitive paperwork a machine can prepare, and which are decisions a licensed person must own?

What SolarAPP+ teaches, and what it does not

Anyone selling AI to solar contractors may point to SolarAPP+, so it is worth being precise about what it is. SolarAPP+ is a DOE-funded platform that local governments use to check residential rooftop permits automatically for code compliance. It is a rules-based system. It runs on fixed code checks, it is not AI, and it is not a contractor’s in-house tool, though installers submit through it.

The results are strong. In 2023, according to the national lab behind it, a typical SolarAPP+ project was permitted and inspected 14.5 business days sooner than a traditional project, based on median timelines.[1] It saved around 15,400 hours of local permitting staff time.[1] The lab’s modelling suggests it cut install costs by around 2% to 13% and raised rooftop deployment by around 2% to 17% in participating jurisdictions.[1] Those are wide, modelled ranges. The lab, then called NREL, is now the National Laboratory of the Rockies.

Three lessons follow. Delay in paperwork is expensive enough to attack. A plain rule engine, not a clever model, delivered this result, which is why our guide to automation versus agents tells you to try rules first. And none of those numbers are evidence that AI helps an installer. The time saved in those hours belongs to local government, and the speed came from a change in how the AHJ, or authority having jurisdiction, reviews a permit.

Permit timing figures measure different things. LBNL data, as reported by Mercom, shows a median of six days from application to permit issue for standalone residential solar in 2025, while NREL’s median from permit submission to passed inspection for PV-only projects in 2023 was 33 days on SolarAPP+ against 47.5 days without it.[6][7] The first stops at issue, and the second runs through inspection, so do not compare them.

From utility bill to PTO: who does what

Here is one residential or light commercial project, split by who should do each step.

One solar project, from lead to service

  1. Intake

    • Answer and sort inquiries
    • Book the site visit
    • Read the utility bill, with permission
    AI
  2. Design

    • Layout and electrical design
    • Main panel and structural calls
    • Code decisions
    Person
  3. Proposal

    • Draft from bill and design
    • Fill rate and usage assumptions
    AI
  4. Claim checks

    • Approved rates and escalators
    • Current incentive language
    • Required disclosures
    Rule
  5. Sale sign-off

    • Confirm savings assumptions
    • Confirm financing terms
    • Explain to the customer
    Person
  6. Permit and interconnect

    • Assemble packets
    • Catch missing items
    • Track status and chase documents
    AI
  7. Sign and submit

    • Licensed review and stamp
    • Inspection and commissioning
    Person
  8. Service

    • Summarise tickets
    • Warranty dates
    • Flag repeat faults
    AI
A generic map, not a finding. Jurisdictions, utilities and your own licensing will change the details.

Utility bills

A bill is messy data with a clear shape. AI can pull usage, rate plan and account data from PDF bills, with the customer’s permission. Rate plans deserve care, because a time-of-use plan and a tiered plan change the savings story completely. If the extraction is uncertain, the system should ask for a person, not guess. No independent accuracy figure exists for bill reading, so test on your own utilities’ formats.

Proposals

AI can draft a proposal from the bill and site details, in your template. A fast, polished draft is also the danger. A person must check the savings assumptions, the rate, the escalator and the financing. We know of no independent measure of AI’s effect on proposal speed or close rate, so treat vendor figures as marketing.

Proposal review

Sample data, invented
  1. A request is typed in: Draft a proposal from this bill and site survey.
  2. The work moves through Read, Draft, Check, Review.
  3. Results appear: Twelve months of usage read; Rate plan matched to the utility tariff; Federal tax credit line removed from template.
  4. Savings estimate uses a rate escalator waits for a person, who acts on it.
  5. Approved by Sales Manager, 2:40 pm.

Before: by hand

A sales rep copies an old proposal, changes the numbers and hopes the language is still current.

Sample data, invented

After: ready for review

Twelve months of usage read. Rate plan matched to the utility tariff. Federal tax credit line removed from template. Savings estimate uses a rate escalator waits for a person.

Approved

Approved by Sales Manager, 2:40 pm

  • Assumptions shown
  • Stale language blocked
  • A person approves every claim

Illustrative example. Actual results vary.

Permit packets

Permit requirements vary by AHJ, and a wrong form or stale rule costs you a resubmission. AI can assemble the packet, track each jurisdiction’s requirements in a maintained checklist, and catch missing items before submission. Keep that checklist as a controlled document with an owner. Where a jurisdiction uses SolarAPP+, use it. In 2023, 668 installers submitted 18,906 permits through it, across 150 local governments, per NREL text reprinted by CleanTechnica.[7]

Customer calls

Between sale and PTO, the most common question is “where is my install?”. A status answer drawn from your project system can spare your coordinators some interruptions, and it helps customers too. Service issues should be sorted and sent to people, especially anything involving a fault, heat, smell or a safety concern.

O&M records

For firms with a service book, AI can summarise service tickets, keep warranty dates, and flag sites with repeat faults for a technician to look at. An inverter that keeps throwing the same fault across three visits is easy to miss when each ticket was closed by someone else. No independent number exists for O&M savings. Any documents you want handled this way fit our document processing service, and the workflow guide explains how to measure the gain.

Interconnection: know which queue you are in

Interconnection is where project scale changes everything, and where the wrong statistic can mislead a customer. LBNL’s study of 2.7 million applications across 188 utilities in 24 states, reported by pv magazine USA, gives these median times to permission to operate.[3]

Median months to permission to operate, by system size

  • Under 30 kW2 months
  • 30 to 100 kW9 months
  • 100 to 500 kW16 months
  • 500 kW to 1 MW24 months
  • 1 to 5 MW45 months
LBNL data for 2020 to 2025, as reported by pv magazine USA.[3] We could not open LBNL’s page, so this is a secondary reading. Timelines include construction and inspection, not just utility review.

The same report says 76% of projects above 100 kW had not reached PTO, against 8% of those below 100 kW.[3] If you do commercial work, the application is a live project of its own, and tracking it across years is where assistance pays. Status tracking, chasing missing documents, summarising utility letters and flagging deadlines are good jobs for AI, with a person watching the study results and any cost allocation.

Do not mix in transmission numbers. LBNL’s Queued Up report found the median project built in 2025 took 61 months from request to operation, and about 2,061 GW sat in active queues at the end of 2025.[8] That report covers large power plants on the bulk power system, not distribution-connected or behind-the-meter systems. A rooftop article or proposal quoting it would mislead. Rules also differ by state: the 2026 Freeing the Grid scorecard from IREC and Vote Solar gave only New Mexico an A, reported pv magazine USA, and it grades written rules and not how utilities perform.[9]

Risks and rules for solar contractors

This describes the rules and reported actions as of November 2026. It is not legal or tax advice. Allegations below are allegations unless we say otherwise.

Old tax-credit language

This is the most concrete risk in this article. The IRS says the residential clean energy credit is not available for any property placed in service after December 31, 2025.[2] A proposal template or call script trained on older material may still promise the 30% credit, and the IRS page is the place to check that language against.[2] Mercom reports third-party-owned systems were about 40% of residential in 2025, and their tax treatment differs, so do not generalise in either direction without a tax adviser.[6] Purge old proposals from anything an AI drafts from, and block the phrase with a rule.

Savings claims

State attorneys general are active. In spring 2026 Texas sent demands to four residential solar companies covering energy bill savings claims and how the firms track them.[10] In 2023 Arizona settled with Solar Xchange and its owner over Do Not Call and misrepresentation allegations, with a $13.8 million civil penalty, partly suspended.[11] New York’s attorney general has described a $275 million fraudulent scheme in a complaint alleging panels were marketed as free and government-funded, which is an allegation and not a finding.[12]

None of those cases is about AI. They do set the standard an AI proposal will be held to. It needs the same substantiation as a salesperson’s claim, with its assumptions visible, and we would not count on “the software wrote it” as a defense.

AI voice calls

In February 2024 the FCC confirmed that AI-generated voices count as artificial or prerecorded voices under the Telephone Consumer Protection Act.[13] Orrick’s analysis says marketing calls need prior express written consent.[14] Inbound answering is a different case from outbound marketing, so have counsel confirm your setup. Arizona’s case shows that telemarketing liability can reach lead generators as well.[11]

Permits, design and licensing

Keep a licensed person accountable for design and code decisions. AI should not be choosing conductor sizes, confirming a main panel upgrade or signing off a structural question. It can assemble what the licensed person reviews. Remember that rules vary by jurisdiction and utility, and that a confident answer from stale training data is worse than no answer.

Customer data

Utility bills hold account numbers and usage history. Get permission, and check how any AI vendor stores them. This is general reasoning rather than a specific rule. Our security article covers what to ask a vendor.

Where to use which control

RiskRulePerson
Stale incentive languageBlocked phrase list, reviewed quarterlyTax adviser checks the wording
Savings overstatedEscalator and rate limits in the templateSales manager approves each proposal
Outbound AI callsConsent record checked before dialingCounsel reviews the program
Permit errorChecklist per AHJ, with an ownerLicensed reviewer signs
Our suggested controls, not legal requirements.

Where a contractor should begin

Start where an error is cheap and caught before it reaches anyone. Permit packet completeness and project status updates are good first candidates. Proposals come later, once your claims rules are in place, because a wrong proposal reaches a customer.

  1. Clean your templates. Remove expired incentive language from everything, including old proposals in shared drives.
  2. Pick your three busiest AHJs and write a controlled checklist for each.
  3. Have AI check packets against those checklists before submission, and log what it catches and misses.
  4. Count your resubmissions and days from signature to PTO, so you have a baseline.
  5. Connect status answers to your project system, with a person on anything unusual.
  6. Add proposal drafting last, with rules and an approval step.

Our guide to how to start with AI covers the pilot in more depth. If you want a written plan for your business, the two-week AI Assessment maps your workflows and is credited toward a pilot. We work at fixed prices, with a senior scientist on every project. Your data stays in your accounts, and people approve anything that moves money or reaches a customer.

Questions

Can AI write a solar proposal?

It can draft one from a utility bill and site details. A person must check the savings assumptions, rate and financing before it reaches a customer, and any tax language needs to match current law.[2]

Can AI read a utility bill?

It can, with the customer’s permission. It can pull usage, rate plan and account details from a PDF. Accuracy varies by utility, and no independent figure exists, so test your own utilities’ bills and flag uncertain fields for review.

Is SolarAPP+ an AI tool?

No. It is a rules-based government-side system for checking residential solar permits. Its results are strong, but they are evidence for automated code checks and not for AI at an installer.[1]

How long does solar permitting take?

It depends on the jurisdiction. LBNL data reported by Mercom puts the median standalone residential permit at six days from application to issue in 2025, though projects vary widely.[6] That excludes inspection, which adds more time.

How long does interconnection take?

For systems under 30 kW, the median time to permission to operate was about two months in LBNL data reported by pv magazine USA. At 1 to 5 MW it was 45 months. Both figures include construction and inspection.[3]

Is it legal to use AI to call solar leads?

AI voices count as artificial voices under the TCPA, so outbound marketing calls need consent, and Orrick’s analysis says prior express written consent.[13][14] Answering inbound calls is a different case. Have counsel review your program, as this is not legal advice.

Will AI fix interconnection delays?

No. Utility review, studies and upgrades move at their own pace. AI can make sure your side is complete and on time, and that nothing sits unanswered in an inbox.

Sources

  1. National Laboratory of the Rockies, formerly NREL, SolarAPP+ Performance Review: Final Technical Report (NREL/TP-6A20-91752), November 2024.
  2. Internal Revenue Service, Residential Clean Energy Credit, Reviewed July 2026.
  3. pv magazine USA, reporting LBNL, Distributed solar interconnection timelines stretch to nearly four years for larger projects, October 2026.
  4. Lawrence Berkeley National Laboratory, U.S. Distributed Solar and Storage: 2026 Data Update, August 2026.
  5. PV Tech, reporting SEIA and Wood Mackenzie, US adds 43.2GW of new solar PV capacity in 2025, March 2026.
  6. Mercom, reporting LBNL, US Residential Solar-Storage Adoption Jumps to 37% in 2025, October 2026.
  7. CleanTechnica, reprinting NREL, SolarAPP+ Has Cut 150,000 Business Days of Solar Permitting Process, June 2024.
  8. Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition, June 2026.
  9. pv magazine USA, reporting IREC and Vote Solar, Most states face regulatory logjams on solar-plus-storage as interconnection procedures lag, May 2026.
  10. PV Tech, Texas Attorney General investigates residential solar installers for ‘fraudulent’ practices, April 2026.
  11. Arizona Attorney General, Attorney General Mayes Sues Residential Solar Installation Company and Telemarketer, July 2023.
  12. pv magazine USA, New York attorney general files $275 million lawsuit against Attyx for deceptive solar sales, March 2026.
  13. Federal Communications Commission, Declaratory Ruling FCC 24-17 on AI-generated voices under the TCPA, February 2024.
  14. Orrick, Did the FCC Really Ban AI-Generated Voice Calls? No . . . But Restrictions Apply, February 2024.
A practical place to start

See where AI fits in your business.

In two weeks we map how your business runs, where AI helps and where it does not, and hand you a written plan.