AI that searches your manuals, SOPs, work orders and quality records, shows the revision it used and drafts the paperwork. Your people approve it. Start with one line.
People stay in charge. Every answer shows its document and revision. Your team approves work orders, quality records and anything that touches safety.
Answers show revision and page
Obsolete copies flagged
Documents, not live machine data
The manual is in the plant somewhere. The hard part is knowing which copy is current.
Plant knowledge sits in binders, shared drives, the CMMS and the heads of your most experienced people. We help your team reach the approved version, see what changed and turn it into a draft a person can check.
Where plant knowledge gets stuck
The answer usually exists. A technician at a stopped machine wants the fault table, a planner wants the last repair, and a quality lead wants the NCR from the same supplier last spring. Each search crosses a different system, and each one raises the same question: is this still the approved version? The starting point is the record your team already trusts. We identify document owners, revision status and who should see what before choosing a first project.
Which manual is current?
The binder at the machine, the shared drive and the CMMS attachment can each show a different revision.
Shift handover gaps
Notes live on a whiteboard, a paper log or a text thread. Follow-ups never become work orders.
History buried in free text
Closed work orders hold the fix, but in shorthand that is hard to search.
NCR and CAPA paperwork
Quality staff hunt for past records on the same part, then copy old wording into a new form.
Changes that miss the floor
An ECN updates the drawing, while the PM task, work instruction or energy control procedure lags behind.
One question. The approved record for that asset.
How to find the current manual with AI: ask about an asset, then open the cited document and revision.
Find the approved passages, check the revision, then draft an answer with sources.
Ask the plant record
Sample plant, invented
Maintenance Planner: Which manual revision is current for Press 7, and did the last engineering change affect the quarterly PM? Rev D of Manual MP-7 is released for Press 7. ECN-118 changed the return filter, and task PM-7Q still cites Rev B. A person should update that task. Sources: Manual MP-7, Rev D, Task PM-7Q, last closed on WO-3982, ECN-118, register entry.
Maintenance Technician: Press 7 shows fault H-14. What does the manual say to check first? Manual MP-7, Rev D lists the return filter indicator first. Service it only under approved procedure LOTO-P7-02. This is the manual, not live machine status. Rev B is obsolete. Sources: Manual MP-7, Rev D, fault table.
The manual workScroll to advance this example, or use the slider.
Maintenance Planner asks: Which manual revision is current for Press 7, and did the last engineering change affect the quarterly PM?
Equipment manuals, SOPs and work instructions, Work-order history, ECNs and revision register, Supplier and PO records, Shift handover notes, Licensed standards, Old shared-drive copies are the connected sources. Manual MP-7, Rev B · Obsolete. Not shared with this role.
The assistant retrieves passages the person may read, then drafts an answer.
A cited draft appears for review: Rev D of Manual MP-7 is released for Press 7. ECN-118 changed the return filter, and task PM-7Q still cites Rev B. A person should update that task.
In the second setting: Manual MP-7, Rev D lists the return filter indicator first. Service it only under approved procedure LOTO-P7-02. This is the manual, not live machine status. Rev B is obsolete.
At the planner’s desk
Maintenance Planner: Which manual revision is current for Press 7, and did the last engineering change affect the quarterly PM?
Cited answer
Rev D of Manual MP-7 is released for Press 7. ECN-118 changed the return filter, and task PM-7Q still cites Rev B. A person should update that task. Sources: Manual MP-7, Rev D, Task PM-7Q, last closed on WO-3982, ECN-118, register entry.
At the asset
Maintenance Technician: Press 7 shows fault H-14. What does the manual say to check first?
Cited answer
Manual MP-7, Rev D lists the return filter indicator first. Service it only under approved procedure LOTO-P7-02. This is the manual, not live machine status. Rev B is obsolete. Source: Manual MP-7, Rev D, fault table.
Revision shown on every answer
Obsolete copies flagged
Every answer cited
Illustrative example. Actual results vary.
Sample sources from this demo Sample plant, invented
Manual MP-7, Rev D
Section 6.3, Return filter service. Replace element RF-22 when the indicator reads red. Rev D supersedes Rev B. Follow energy control procedure LOTO-P7-02 before opening the reservoir cover.
Task PM-7Q, last closed on WO-3982
Quarterly PM, Press 7. Step 4: replace return filter per Manual MP-7, Rev B, section 6.1. Closed by second shift. Note: "element number on the shelf doesn’t match the task."
ECN-118, register entry
ECN-118, Press 7 hydraulic unit. Return filter changed to element RF-22. Manual MP-7 raised to Rev D. Status: released. Affected items listed: manual, spares list. PM task not listed.
Manual MP-7, Rev D, fault table
Table 9-2, Hydraulic faults. H-14, low return flow. Check first: return filter indicator. Check second: reservoir level. Any service work: see energy control procedure LOTO-P7-02.
Connected to 8 sources
Equipment manuals, SOPs and work instructions, Work-order history, ECNs and revision register, Supplier and PO records, Shift handover notes, Licensed standards, Old shared-drive copies
Steps
1 Find · 2 Check revision · 3 Draft
Control tags
Released revision · Approved source · Access by role · Audit logged
Marked in the record
Manual MP-7, Rev B · Obsolete. Not shared with this role.
Control tags are settings we configure with your team, not automatic features of RAG. This sample works from documents only. Live machine status needs an authorized system connection, which is a separate decision with its own review.
RAG means the assistant looks up relevant passages before it drafts an answer. Permissions apply first, so it searches only what that person may read. It prefers the released revision and marks obsolete copies, but only if your document register says so. It does not make the record correct on its own: a missing revision, an unlinked asset or two documents that disagree need a person. When the sources conflict, it shows both. When the record doesn’t settle the question, it says “I can’t answer from the record” and names who to ask. A manual can tell a technician what to check. It can’t say what Press 7 is doing right now, so a question about current pressure or running state gets that same answer. Reading live status takes an authorized connection to the system that holds it, not a better document search.
Built for every seat in the plant
A plant-wide search box is not the same as the right access. We set scope around a person’s job, area and assets, then make the source easy to inspect. The questions below are invented examples of plant knowledge, not maintenance or safety instructions.
Sample plant, invented
Maintenance planner
Sample questions
Which PM tasks still cite an obsolete manual?
What fixed this gearbox the last two times?
Draft a work order from this fault note.
Answers come from
Released manuals, the revision register, PM tasks and closed work orders.
Where your people stay in charge
The planner checks the draft, sets priority and decides what gets scheduled. Nothing is released from the assistant.
Maintenance technician
Sample questions
What does the manual say about fault H-14?
Which filter element does this unit take now?
Has anyone seen this noise on Press 7 before?
Answers come from
Released manuals, approved work instructions and past work-order notes for that asset.
Where your people stay in charge
The technician confirms the cited page against the machine in front of them and follows the plant’s lockout program. Live readings come from the machine or an authorized system, not from a document.
Shift lead
Sample questions
What’s still open from last shift?
Which handover items have no owner?
Summarize tonight’s notes for the morning lead.
Answers come from
Handover notes, open work orders and the shift log.
Where your people stay in charge
The shift lead edits the summary and assigns the follow-ups. The oncoming lead decides what happens first.
Quality lead
Sample questions
Have we seen this defect from this supplier?
Which CAPA came out of the last similar NCR?
Does this certificate match the PO and spec revision?
Answers come from
NCRs, CAPAs, supplier certificates, purchase orders and inspection plans you approve.
Where your people stay in charge
The quality lead or review board decides disposition, root cause and closure. The assistant does not certify product quality.
Manufacturing engineer
Sample questions
Which work instructions cite the old drawing revision?
What else does this ECN touch?
Where is the approved process sheet for this part?
Answers come from
ECNs, drawings, routings, work instructions and the revision register.
Where your people stay in charge
Engineering approves every change. Document control releases and retires documents through the normal process.
EHS lead
Sample questions
Which assets have no linked energy control procedure?
Which procedures predate the last ECN on that asset?
Where is the approved procedure for this press?
Answers come from
The energy control procedure register, asset list, ECN log and inspection records.
Where your people stay in charge
EHS and authorized employees write, inspect and approve procedures. The assistant lists gaps and links the approved document. It does not shorten, rewrite or sign one.
Sorting a week of plant paperwork
Illustration
A week of plant paperwork, mostly by hand
We sort it with you
Lookups and drafts handled. Decisions stay with people.
AI assistant
Reads, finds and drafts with sources
Drafts wait for review
Simple rule
Same check every time
A person
Safety, quality and sign-off
Find the current manual
Approve lockout procedures
Draft a work order
Decide an NCR disposition
Flag superseded revisions
Check a cert against the PO
Scroll to sort
What we build for plants
Most plants don’t need a site-wide rollout to learn whether this works. We choose one bounded job, connect the records you approve and keep the review step visible. Some jobs need a search, some need a simple rule, and only a few need an agent.
Search manuals and SOPs by asset, with the revision shown
Ask about an asset in plain language. The answer cites the document, revision and page, and it is set up to use only released documents you’ve approved. You’d measure this by lookup time on real questions and by how often the correct source comes back.
Examples for plants
Find the fault table for one press.
Pull the current work instruction for a part.
Show which manual applies after a rebuild.
Say so when no approved source exists.
Where your people stay in chargeYour team chooses the sources, keeps the revision register current and checks the cited page before acting.
An agent reads the note, finds the asset, pulls the current manual and past repairs, and saves a draft. We would give it read access and one allowed action: create a draft. It couldn’t release, assign, close or order anything.
Examples for plants
Match a fault note to the right asset.
Link the approved manual section.
Attach similar closed work orders.
List suggested parts for a person to confirm.
Where your people stay in chargeThe maintenance manager or planner reviews every draft and decides whether it is released.
That’s an AI agent with one allowed action: save a draft.
Fault note to draft work order
Sample plant, invented
The manual workScroll to advance this example, or use the slider.
A request is typed in: Draft a work order for this Press 7 fault note.
The work moves through Read, Retrieve, Compare, Draft, Review.
Results appear: Manual MP-7, Rev D retrieved; Shared-drive copy Rev B set aside; Two past repairs linked; No approved lockout procedure for this change.
Draft WO-4471, not released waits for a person, who acts on it.
Held by Maintenance Manager, 9:42 am, sent to EHS.
Before: by hand
A planner opens the asset, hunts for the manual, searches old work orders and retypes the fault note.
Sample plant, invented
After: draft held, nothing released
Manual MP-7, Rev D retrieved. Shared-drive copy Rev B set aside. Two past repairs linked. No approved lockout procedure for this change. Draft WO-4471, not released waits for a person.
Held for EHS
Held by Maintenance Manager, 9:42 am, sent to EHS
Drafted from approved records
A missing procedure stops the draft
A person decides
Illustrative example. Actual results vary.
Released
Manual MP-7, Rev D retrieved
Obsolete
Shared-drive copy Rev B set aside
History
Two past repairs linked
Needs information
No approved lockout procedure for this change. LOTO-P7-02 predates ECN-118. This draft can’t move forward until EHS confirms the procedure.
Review
Draft WO-4471, not released. A person decides what happens next.
Ask your work-order history a plain question
Counts and dates come straight from CMMS records, not from a model’s reading. Free-text notes are searched alongside them, so the shorthand your technicians wrote still helps. Every figure links back to the records behind it.
Examples for plants
Count failures on one gearbox this year.
Find repeat fixes across shifts.
Compare parts used on similar assets.
List PMs that keep getting deferred.
Where your people stay in chargeYour maintenance lead interprets the pattern and decides whether to change a PM or a repair.
Turn shift notes into a summary with named follow-ups
Read typed, photographed or spoken notes into a consistent summary with open items. Unclear handwriting is marked for a person to check, and routing to the right owner follows a simple rule.
Examples for plants
Sort notes by line and asset.
List open items for the next shift.
Mark an unreadable entry for checking.
Suggest which item may need a work order.
Where your people stay in chargeThe shift lead edits the summary and assigns the follow-ups before it is shared.
Search earlier NCRs and CAPAs by part, supplier and defect, then fill the known fields in a draft. Disposition and root cause stay blank for your quality team. You’d measure this by time to a complete first draft and edits per draft.
Examples for plants
Find similar records for one defect.
Pull the CAPA tied to a past NCR.
Fill part, lot and supplier fields.
List the questions still open.
Where your people stay in chargeThe quality lead or review board owns disposition, root cause, CAPA closure and effectiveness checks.
That’s document processing, with a quality lead reviewing.
NCR first-draft pack
Sample plant, invented
The manual workScroll to advance this example, or use the slider.
A request is typed in: Prepare NCR-2093 for the quality lead.
The work moves through Read, Match, Compare, Draft, Review.
Results appear: Part and lot matched; Three similar NCRs found; One linked CAPA found; Spec revision conflict.
First draft of NCR-2093 waits for a person, who acts on it.
Reviewed by Quality Lead, 2:18 pm.
Before: by hand
A quality engineer searches old NCRs by memory, then copies wording from the last one that looks close.
Sample plant, invented
After: draft reviewed, disposition open
Part and lot matched. Three similar NCRs found. One linked CAPA found. Spec revision conflict. First draft of NCR-2093 waits for a person.
Reviewed
Reviewed by Quality Lead, 2:18 pm
Past records found
Conflicts shown, not settled
Quality decides
Illustrative example. Actual results vary.
Matched
Part and lot matched
History
Three similar NCRs found
History
One linked CAPA found
Needs information
Spec revision conflict. The supplier cert cites spec Rev E, and PO-5512 calls for Rev F. A person has to resolve this.
Review
First draft of NCR-2093. Disposition and root cause left blank.
Catch stale references and mismatched certificates
Simple rules compare what a PM task, work instruction or certificate cites against your register and purchase order. AI is used only to read the PDF. This job rarely needs an agent, and a rule is easier to test.
Examples for plants
Flag a PM task citing an old revision.
Compare a supplier cert with the PO.
Check lot and spec revision on a packet.
List documents with no owner.
Where your people stay in chargeDocument control clears the flag. An authorized person signs any certificate of conformance.
Works alongside the systems your plant already runs
Read-only first is the usual starting point. We agree which records count as approved, how permissions carry through and who maintains the revision register before adding any drafting step. The default stops at documents and business records, away from the plant-floor network.
Sources
Released manuals, SOPs, work instructions, work orders, ECNs, NCRs, CAPAs, supplier certificates and scanned paper.
Connection and permissions
Read-only first · access by role and asset · revision aware
These are categories of tools a plant may already use, not a list of integrations. No partnership, certified connector or integration with any product is implied. We confirm what’s practical for your setup during the AI Assessment.
If your manuals already sit in one CMMS and its built-in assistant comes with your plan, try that first. If a binder cleanup or a checklist fixes the problem, do that instead. Custom work makes sense when an answer has to cross several systems, or when revision status must hold across them.
Controls for a working plant
Knowledge, not machine control
The assistant reads approved documents and business records. By default we would design it with no path to control systems, so it can’t change a setting. Live status needs an authorized system connection, scoped separately.
Revision checks
Released documents come first and obsolete copies are marked, based on your register. If the register is wrong, a person has to fix it.
Cited answers, or no answer
The document, revision and page stay beside the answer. When sources conflict or nothing approved exists, it says so.
Safety stays in your program
It links the approved energy control procedure. It doesn’t rewrite, skip or override lockout and tagout steps, and a request to bypass a safeguard goes to a person.
Access, records and your data
Access by role applies before retrieval, and questions and reviews have an agreed record. Your data stays in your accounts, and we never train models on it.
AI finds, drafts and flags. It doesn’t certify product quality, disposition an NCR, approve an ECN or sign a certificate of conformance. We would index only the standards your plant is licensed to use, and customer-restricted or controlled data only after you clear it.
These are settings we configure with you. They aren’t automatic features of RAG.
Choose a document set someone already maintains and a named person responsible for the result. The criteria below are proposed starting points to agree with your team. None describes a past result.
Sample plant, invented
One line’s manuals and SOPs
Inputs
The asset list for one line, released manuals and SOPs, the revision register, and real questions collected from technicians.
Scope
Read-only. One line and one shift team. No machine data, no write-back. Lockout procedures are linked as approved documents, not paraphrased.
Deliverables
A cleaned document set, the assistant, a test set of questions with expected sources, a list of missing or obsolete documents, and a short results memo.
Review owner
The maintenance manager, with document control.
How we would measure it
Every answer shows document, revision and page. No test answer cites an obsolete document. The correct source comes back at a rate agreed at kickoff. Lookup time is compared with a baseline measured at the start. The shift lead says whether to keep it.
NCR search and first drafts
Inputs
Closed NCRs and CAPAs from an agreed period, defect codes, part and supplier lists, and your NCR template.
Scope
One product family or plant area. Customer-restricted or controlled data stays out until cleared. Drafts stay outside the QMS until a person enters them.
Deliverables
A searchable record set, a draft pack with similar past records and open questions, a test set, and a short results memo.
Review owner
The quality manager.
How we would measure it
Every fact in a draft traces to a record or the user’s entry. Disposition and root cause stay blank or marked unconfirmed. Reviewers rate retrieved records on a sample. Edits per draft and time to a complete first draft are compared with a measured baseline.
Illustrative example. Actual results vary.
A fixed-price first step
01
Assess
Two weeks. A fixed-fee review of your sources, workflow and a practical first scope. Credited toward a Pilot.
$2,500
02
Pilot
One project or one document set, with a fixed price and date.
03
Run and Improve
Optional monthly support. Never required to get the build.
We usually start with one project or one department.
Why talk to us first
Some CMMS and QMS products now include AI features, and they may be enough. We build custom systems when your records and review steps call for one, and we’ll say so when they don’t.
We check the simple fix first
A naming rule, a checklist or the feature you already pay for may solve it. You’ll hear that from us.
A senior scientist stays with the project
PhD-led applied-AI work, with a senior scientist on every project and no hand-offs.
A fixed price, and you own what we build
We agree the scope before the build, document the result and keep optional support a separate decision.
Common questions
Do we need AI for this, or a better checklist?
Maybe a checklist. NIST’s guide for manufacturers says a checklist, standardized procedures or training might be all you need, and that you should compare the cost of a simple fix first. If your documents are organized and the gap is a process gap, start there.
Our CMMS already has AI. Why would we need you?
You may not. Some CMMS products can answer from attached manuals and draft procedures, so check your plan and try it first. Outside help makes sense when an answer has to cross the CMMS, QMS and shared drives, or when revision control has to hold across them.
Will it touch our machines?
No. The system on this page works from documents and business records. It can’t change a setting, and it can’t tell you what a machine is doing right now. Live status needs an authorized connection to the system that holds it, which is a separate decision. Joint guidance from CISA and partner agencies in December 2025, written for critical infrastructure operators, advises limiting active AI control of operational technology without a person in the loop.
Could it give a technician a wrong or unsafe instruction?
Any AI can be wrong. So answers show the document and revision, the assistant says when no approved source exists, and safety questions go to your approved procedure and a named person. A technician checks the cited page against the machine in front of them.
Can it write or change our lockout procedures?
No. Under federal OSHA’s 29 CFR 1910.147, energy control procedures belong to the employer, with inspection at least annually by an authorized employee other than those using the procedure. State-plan rules may differ. The assistant can link your approved procedure and list assets where one is missing or older than the last change. Your team does the rest.
How does it know the manual is current?
It knows what your revision register says. It’s set up to filter on released status and flag obsolete copies. If nobody tracks revisions yet, that cleanup is the first job, and it’s worth doing anyway. A person can always open the cited source.
Will our people use it?
Only if they help shape it. In a PwC and Manufacturing Institute survey of over 100 manufacturing leaders, fielded in Q3 2025, 72% cited resistance from employees comfortable with existing systems. We start with a real question from a shift lead and keep them in the pilot.
Will it pass an audit, or handle our customer data?
AI drafts don’t change who is responsible. They go through your document control and approvals, and the system certifies nothing. Device makers should ask their regulatory lead: FDA said in December 2025 that ISO 13485 certification by itself doesn’t ensure compliance with its quality regulation. For defense or customer-restricted data, the rules have to be checked before any data moves.
Pick one asset or one recurring lookup. We’ll look at the documents behind it, who approves the result and whether a simple fix would do the job. A PhD-led applied-AI consultancy in Carlsbad, California. Fixed prices. A senior scientist on every project, with no hand-offs.